


Epoxy Flooring Sherman Oaks, CA
We coat garages, patios, driveways and shop floors from Ventura Boulevard to the canyon streets, with posted prices and a limited lifetime adhesion warranty.
Limited lifetime adhesion warranty · Free on-site estimates · Shop at 1653 Stanford St #1, Santa Monica
Free On-Site Estimate
How much does epoxy flooring cost in Sherman Oaks?
Epoxy flooring in Sherman Oaks starts at $2,600 per project. A flake epoxy garage floor of up to 400 sq ft, the size of a typical two-car garage, costs $2,600-$4,000 at $6.50-$10 per sq ft and installs in one day. Solid color, metallic and quartz run higher and take two to four days.
Sherman Oaks is a San Fernando Valley neighborhood of the City of Los Angeles, founded in 1927 and named for General Moses Hazeltine Sherman, and the Sherman Oaks Neighborhood Council serves as its civic voice. Our shop on Stanford Street in Santa Monica lies about 9.1 straight-line miles from the Ventura Boulevard core, and a free estimate comes first on every job.
Below you will find the ZIP codes and landmarks we measure from, how the epoxy and polyaspartic layers differ, the eight-step flake process, what summer heat and canyon lots mean for a floor, and every approved price.
Sherman Oaks ZIP codes and the places we measure from
Sherman Oaks centers on Ventura Boulevard and Van Nuys Boulevard, with 91403 and 91423 as its core ZIP codes. Edge addresses can also carry 91401 or 91411, which the neighborhood shares with Van Nuys. Every distance is a straight line from the Ventura and Van Nuys crossing, not a driving route.
| Place | What it is | Straight-line miles |
|---|---|---|
| Ventura and Van Nuys | Central crossing, ZIP 91403 | 0.0 |
| Ventura and Beverly Glen | Canyon road south, ZIP 91423 | 0.2 |
| Sherman Oaks Branch Library | Moorpark Street, ZIP 91423 | 0.3 |
| War Memorial Park | North of Magnolia, ZIP 91423 | 0.8 |
| Deervale-Stone Canyon Park | Hillside, Valley Vista Boulevard | 0.8 |
| Sherman Oaks Galleria area | Galleria Lane, ZIP 91403 | 1.1 |
| Sherman Oaks Castle Park | Sepulveda Boulevard, 91403 | 1.4 |
| Dixie Canyon Park | Canyon park in the foothills | 1.8 |
Miles are rounded straight-line figures. ZIP codes come from public map tags, so check yours with the USPS lookup before you rely on it.
Epoxy garage floor Sherman Oaks: where epoxy and polyaspartic each fit
Contractors in the Valley argue about epoxy, polyaspartic and polyurea, so here is our plain split. Epoxy builds the bond and the body of the floor, and a UV-stable polyaspartic topcoat protects the surface from sun and hot-tire pickup. On a flake garage floor the basecoat is chosen by the slab: a pigmented moisture-barrier epoxy when the slab needs moisture protection, or a pigmented polyaspartic when moisture is not the problem and UV resistance is.
Flake installs in one day at $6.50-$10 per sq ft. Solid color epoxy takes 3 days at $9.50-$11.50, metallic epoxy takes 3-4 days at $12.50-$18.50, and a quartz or sand finish built as a broadcast system takes 2-3 days at $9-$16.50. Choose shades on the color chart.
Outside the garage, a polyaspartic patio coating, driveway coating or pool deck coating is a 1-2 day job at $8-$12 per sq ft, and the outdoor coatings page explains why polyaspartic is the better choice in direct sun. The garage floor epoxy overview sets every option side by side.

How a Sherman Oaks garage goes from bare slab to finished flake in eight steps
This is the flake process only. Metallic, solid color and quartz floors run on their own schedules, which we explain at the estimate.
- Look it over We stand in your garage, measure the slab and note every crack, oil spot and leftover coating.
- Check for moisture A calcium chloride kit or an in-slab RH probe tells us what the concrete is doing, and the coating maker's limits decide the basecoat.
- Open the surface Diamond grinding strips the weak skin off the slab and creates the bonding profile the coating needs.
- Fix the damage We route out cracks, fill them and level spalled edges so repairs stay invisible under the finish.
- Roll the basecoat A pigmented moisture-barrier epoxy goes on if the slab calls for it, or a pigmented polyaspartic when sun matters more than moisture.
- Throw the chips Flake is broadcast to full rejection over the wet basecoat, then the excess is scraped up and swept off.
- Lock it in A UV-stable polyaspartic topcoat seals the chips and stands up to hot-tire pickup.
- Final look We go over the result with you, show you how to care for it and review the warranty paperwork.
Hot Augusts, canyon lots and older concrete in Sherman Oaks
Sherman Oaks is inland, so it bakes in summer. Mean daily highs climb from about 67 F in January to about 92 F in August, and around 17 inches of rain a year falls almost entirely between October and April. A garage door that faces west can pour afternoon sun across the floor for hours, which is the case for a UV-stable topcoat on anything that gets light.
The neighborhood stretches into the Santa Monica Mountains, with Beverly Glen, Stone Canyon and Dixie Canyon lots rising south of Ventura Boulevard. The Los Angeles Fire Department says its Very High Fire Hazard Severity Zone includes portions of Sherman Oaks, so look up your address on the LAFD fire zone history page and its Fire Zone Map. A coating does not change that status, but a garage dug into a canyon slope is where we check the slab hardest for moisture.
The Los Angeles River forms the northern edge of the neighborhood and runs mostly as a concrete-lined flood channel through this stretch. It is a landmark to us and not a prediction about your slab, because the same calcium chloride or RH probe test applies on every street.
A Santa Monica crew with a shop on Stanford Street
We are Santa Monica Epoxy Flooring, and the crew that visits Sherman Oaks starts each day at 1653 Stanford St #1 in the Pico neighborhood. The first visit is a free estimate: we measure the floor, test the slab and put the system, price and install days in front of you.
The limited lifetime adhesion warranty is about one thing, the adhesion of the coating to the slab we prepared. Its written terms come with the estimate, and it excludes damage from impact, chemicals or concrete movement.
Phone lines are open Monday to Thursday from 8 am to 5 pm and Friday from 8 am to 2 pm at (310) 853-8972. You can also use the contact page or read how we work before you call.
What each system costs in Sherman Oaks
Any Sherman Oaks project starts at $2,600, and each row below shows a per-square-foot range next to a typical garage of up to 400 sq ft. Commercial floors in the Ventura Boulevard corridor are quoted after a free site visit.
| System | Per sq ft | Typical 2-car garage | Install time |
|---|---|---|---|
| Flake epoxy | $6.50-$10 per sq ft | $2,600-$4,000 | 1 day |
| Solid color epoxy | $9.50-$11.50 per sq ft | $3,800-$4,600 | 3 days |
| Metallic epoxy | $12.50-$18.50 per sq ft | $5,000-$7,400 | 3-4 days |
| Quartz & sand finish | $9-$16.50 per sq ft | $3,600-$6,600 | 2-3 days |
| Grind and seal | $6.50-$9 per sq ft | $2,600-$3,600 | 1-2 days |
| Patio, driveway & pool deck coating | $8-$12 per sq ft | $3,200-$4,800 | 1-2 days |
Floors like the ones we coat in Sherman Oaks
Open any photo to check the chip blend, sheen and edge detail, then compare shades on the color chart.






Sherman Oaks condo garages, house garages, patios and storefronts
Census figures for ZIPs 91403 and 91423 together count 29,827 homes. Roughly 35% are single-family detached, 60% sit in buildings of five or more units and 40.5% are owner-occupied. About 36% were built before 1960 and another 35% between 1960 and 1979. That points to older slabs, many of them under condo and apartment parking, which is why prep gets so much of our attention.
Older concrete often carries hairline cracks, patched corners and years of oil. We grind past all of it, repair what we find and, for homes where the slab is sound, offer concrete resurfacing as a grind and seal job at $6.50-$9 per sq ft. For a garage floor coating on a rough slab, the repair step is where the quote grows, and any other concrete coating we recommend follows the same prep.
Typical Sherman Oaks requests include:
- House garages, finished as an epoxy garage floor in flake, solid color or metallic
- Condo and apartment parking stalls, once the owner or the board has signed off
- Backyard patios and driveways, finished with a polyaspartic topcoat
- Pool decks, where a pool deck coating is priced at $8-$12 per sq ft
- Shops, offices and storefronts near the Galleria and along Ventura Boulevard, quoted after a free site visit as commercial epoxy flooring
Sherman Oaks epoxy flooring questions, from cost to canyon garages
Epoxy garage floor Sherman Oaks pricing: how much should a coating cost?
A flake epoxy garage floor of up to 400 sq ft in Sherman Oaks costs $2,600-$4,000, which is $6.50-$10 per sq ft. Solid color runs $3,800-$4,600, metallic $5,000-$7,400 and quartz $3,600-$6,600 for the same size. Repairs, moisture protection and extra layers set the final figure inside each range.
How much does it cost to epoxy a 20x20 garage floor in Sherman Oaks?
A 20x20 garage is 400 sq ft, the footprint our two-car prices assume. Flake costs $2,600-$4,000, solid color $3,800-$4,600, metallic $5,000-$7,400 and quartz $3,600-$6,600, while grind and seal comes in at $2,600-$3,600. A free visit replaces these ranges with one written quote.
What does a 500 or 1,000 sq ft epoxy floor cost in Sherman Oaks?
Bigger floors are priced per square foot, with a $2,600 minimum on any project. By system, that means $6.50-$10 for flake, $9.50-$11.50 for solid color, $12.50-$18.50 for metallic, $9-$16.50 for quartz and $6.50-$9 for grind and seal. A final total comes only after we measure the floor and test the slab.
What is the biggest drawback of an epoxy garage floor?
The downsides are prep and sunlight. The coating is only as strong as its bond to the slab, so grinding and a moisture test are required, and plain epoxy can shift color under strong sun. Our UV-stable polyaspartic topcoat addresses the sun side, and the prep side is why we never skip the grinder.
Is it worth coating a garage floor?
For most owners it is, because a sealed floor resists oil stains and hot-tire pickup and is far easier to sweep and wash than bare concrete. Whether it fits you depends on how the garage is used and on what the slab needs first. Our free estimate tells you plainly if a lighter grind and seal is enough.
Will an epoxy floor yellow or peel in the Valley sun?
Peeling traces back mostly to poor prep or moisture, and color change traces back to sun on plain epoxy. We grind to a bonding profile, test the slab and finish with a UV-stable polyaspartic topcoat, which is built for sunlit Valley summers. No coating is immune to abuse, which is why the warranty is limited.
Polyaspartic or epoxy for a Sherman Oaks garage?
Most garage floors use both, with epoxy or polyaspartic as the basecoat and a polyaspartic topcoat. The slab picks the basecoat: a pigmented moisture-barrier epoxy when moisture protection is needed, a pigmented polyaspartic when moisture is not the issue and UV matters. The topcoat gives sun resistance and hot-tire pickup resistance.
Can you coat an older, cracked slab in Sherman Oaks?
Yes, most older slabs can be coated once they are repaired properly. We diamond grind, route out and fill cracks, and rebuild chipped edges before the basecoat. Because roughly 71% of homes in ZIPs 91403 and 91423 were built before 1980, older concrete is common here. Repair work is what lifts a quote toward the top of its range.
How long does a Sherman Oaks epoxy installation take?
Flake epoxy installs in 1 day, solid color in 3 days, metallic in 3-4 days and quartz in 2-3 days. Grind and seal takes 1-2 days, and so does a patio, driveway or pool deck coating. At the estimate we confirm the schedule and tell you when you can walk and park on your specific system.
What is protected by the warranty on a Sherman Oaks floor?
It covers adhesion, meaning the coating staying bonded to the slab we prepared. The paperwork with the exact terms is attached to your estimate. A hard impact, a chemical spill or concrete movement is not covered. The crew that preps your slab stands behind that bond, and you can reach the office at (310) 853-8972 with questions.
Neighboring pages in the Valley and on the Westside
Looking for epoxy flooring near me? These pages sit closest to Ventura Boulevard and Van Nuys Boulevard, in straight-line miles: Encino 3.0, Studio City 3.6, Beverly Hills 6.0, Westwood 6.0, West Hollywood 6.5 and Brentwood 6.9.
Before you pick a date
Compare what an epoxy garage floor costs and how long one lasts, or see how flake, metallic and solid color differ. If you are unsure about doing it yourself, read our professional versus DIY kit comparison. Then check the full cost guide, browse the gallery or see all the places we serve.
