


Epoxy Flooring Mar Vista, CA
Free estimates for homeowners and landlords on garages, driveways, patios and small shops, with prices posted below and a limited lifetime adhesion warranty.
Limited lifetime adhesion warranty · Free on-site estimates · Shop at 1653 Stanford St #1, Santa Monica
Free On-Site Estimate
What does epoxy flooring cost in Mar Vista?
Epoxy flooring in Mar Vista starts at $2,600 for the whole project. The flake floor most owners pick for a two-car garage of up to 400 sq ft lands at $2,600-$4,000, or $6.50-$10 per sq ft, and installs in one day. Metallic, solid color and quartz run higher, and our limited lifetime adhesion warranty covers them all.
Mar Vista is a Westside neighborhood of the City of Los Angeles, and the Mar Vista Community Council is its city-sanctioned neighborhood council. Our shop is on Stanford Street in Santa Monica, and we come to your Mar Vista address to measure, test the slab and write the free estimate.
Whether you want an epoxy garage floor Mar Vista neighbors will admire, a driveway that holds its color in the sun, or a small shop floor that takes daily wear, the first step is the same: diamond grinding so the coating can bond. Our garage floor epoxy page explains the full garage scope, and the sections below cover the neighborhood, its slabs, our prices and our process.
Which epoxy floor suits a Mar Vista garage, driveway or patio?
For most Mar Vista garages the answer is flake epoxy, because it installs in one day and hides tire marks, dust and dings. Our flake epoxy page shows the standard 3-layer build, a 4-layer double topcoat and a 5-layer build with a clear moisture-barrier epoxy first coat.
The sun is the deciding factor outdoors. A polyaspartic topcoat is the UV-stable choice, which is why polyaspartic floor coatings go on driveways and patios and on flake floors where the garage door stays open all afternoon. Under flake, the slab decides the basecoat: pigmented moisture-barrier epoxy when the concrete needs protection, pigmented polyaspartic when moisture is not the concern.
If you want a calmer look, solid color epoxy gives a uniform shade in 3 days, and metallic epoxy adds depth and movement over 3-4 days. A quartz or sand finish, covered on the industrial epoxy flooring page, takes 2-3 days and suits heavy use. Choose a shade on the color chart before the visit.
- Flake: 1 day, the everyday garage choice
- Solid color: 3 days, clean and uniform
- Metallic: 3-4 days, the showpiece look
- Quartz and sand finish: 2-3 days, heavy-use texture
Garage floor upgrade, patio or workshop: what else we coat in Mar Vista
A garage floor coating in Mar Vista mostly fights tires and oil, but a driveway coating has to handle sun, rain and car traffic at once, and the same logic applies to a patio coating beside a back door. Outdoor concrete is priced at $8-$12 per sq ft and finished in 1-2 days, with the slip additive available where wet shoes will cross it. Garage floor repair comes first on older concrete: cracks and chipped joints get filled before any coating goes down.
A pool deck coating adds grip and color to a surface that gets soaked, then baked. Mar Vista's mix of houses and multi-unit buildings also leaves plenty of utility rooms and small workshops with bare concrete, and those get the same grind, repair and seal as a garage. Residential epoxy flooring is not limited to the garage, since an interior utility-room slab can take solid color or grind and seal.
For a sound floor that just needs to look finished, grind and seal is the lighter option, and it is a form of concrete resurfacing covered on the residential page. Concrete coatings for small commercial spaces are quoted after a free site visit, and the commercial epoxy flooring page shows how those builds differ from a home garage.
How Mar Vista's 1967 housing and renter majority shape the job
ZIP 90066 holds 27,045 housing units, and the survey median for their build year is 1967. About 65% went up between 1940 and 1979. Only 39% are detached houses, and 62% of occupied units are rented, so many Mar Vista floors belong to a landlord or a small building owner. Get that owner's written approval before you book, and we will put the scope in writing for them.
Older concrete brings old problems: oil, patched cracks, flaking paint and past coatings. That is why every Mar Vista estimate begins with a look at the slab and a moisture test, either calcium chloride or in-slab relative humidity probes, with the coating maker's limits deciding the build.
The climate is mild and a little damp. Mar Vista's average daily high is 72 F and its average low 55 F, and about 13.22 inches of rain fall in a year, mostly from November through March. A persistent marine layer keeps mornings cool and gray, so we watch dew point and slab temperature before we mix anything.
Because Mar Vista sits inside the City of Los Angeles, permits go through the Department of Building and Safety. Its website says nothing about floor coatings, so if an association or lender asks for a permit answer, call LADBS and we will provide the scope details.
How we lay a flake floor in a Mar Vista garage
These eight steps describe a flake job. Metallic, solid color and quartz floors follow their own schedules, listed in the price table.
- Walk the slab We measure the floor and mark cracks, oil spots, old paint and low spots. In ZIP 90066, where the median home dates to 1967, we expect some history in the concrete.
- Check the moisture Calcium chloride or in-slab humidity probes tell us what the slab is carrying before any resin is mixed, and the coating maker's limits steer the rest.
- Grind it open Diamond grinding with dust control removes old coatings and creates the bonding profile that new resin needs.
- Patch and smooth Cracks, control joints and chipped edges are filled and leveled, so the finished floor looks like one clean surface.
- Lay the basecoat A pigmented moisture-barrier epoxy covers damp-prone concrete, and a pigmented polyaspartic covers slabs where UV resistance matters more.
- Throw the flake Color chips are broadcast by hand until the wet basecoat will not take another one, a full-rejection broadcast.
- Clear the excess When the basecoat has set, extra flake is scraped and swept away, which leaves a textured, even finish.
- Finish with polyaspartic The UV-stable polyaspartic topcoat seals the chips in, and we give you walk-on and parking guidance from the cure data before we pack up.
Epoxy garage floor Mar Vista pricing by system
Mar Vista jobs start at $2,600, and the two-car ranges assume up to 400 sq ft of garage. Each row lists the per-sq-ft rate, the typical project range and the install time.
| System | Per sq ft | Typical 2-car garage | Install time |
|---|---|---|---|
| Flake epoxy | $6.50-$10 per sq ft | $2,600-$4,000 | 1 day |
| Solid color epoxy | $9.50-$11.50 per sq ft | $3,800-$4,600 | 3 days |
| Metallic epoxy | $12.50-$18.50 per sq ft | $5,000-$7,400 | 3-4 days |
| Quartz & sand finish | $9-$16.50 per sq ft | $3,600-$6,600 | 2-3 days |
| Grind and seal | $6.50-$9 per sq ft | $2,600-$3,600 | 1-2 days |
| Patio, driveway & pool deck coating | $8-$12 per sq ft | $3,200-$4,800 | 1-2 days |
Mar Vista landmarks, ZIP code and council area
Mar Vista uses ZIP code 90066, and the community council also covers Hilltop, Westdale and North Westdale. This is how the main reference points line up.
| Area | ZIP | What marks it |
|---|---|---|
| Mar Vista Oval | 90066 | Historic district dating to about 1912 around Palm Place |
| Venice Blvd at Centinela | 90066 | The dividing line: houses north, apartments south |
| Mar Vista Library area | 90066 | Home of the Mar Vista Branch Library |
| Mar Vista Recreation Center | - | Park at the northern edge of the neighborhood |
| Mar Vista Gardens | - | Southeast edge, near the Culver City line |
| Westdale | - | Covered by the Mar Vista Community Council |
| Hilltop and North Westdale | - | Also inside the council's area |
Where the ZIP column shows a dash, no ZIP could be confirmed for that spot. Give us your street when you call and we will check the details for the estimate.
Floor photos from Mar Vista and the Westside
Flake, metallic, solid color and outdoor floors, tagged in Mar Vista and in nearby communities. Tap any photo to enlarge it.






A Westside flooring contractor, a few miles from Mar Vista
Santa Monica Epoxy Flooring works out of a shop at 1653 Stanford St #1, in Santa Monica's Pico neighborhood. Mar Vista sits about 3.6 miles away, measured in a straight line from central Santa Monica.
The free estimate begins with a person looking at your concrete, not a form letter. If you are comparing the best epoxy flooring Mar Vista contractors can offer, ask about prep, moisture testing and warranty terms. Ours is a limited lifetime adhesion warranty, and we describe exactly what it covers in the FAQ below.
Reach the team at (310) 853-8972 Monday through Thursday from 8 am to 5 pm or Friday from 8 am to 2 pm, send a note through the contact page, or learn more about the company.

Mar Vista epoxy flooring questions, from rentals to sun
Epoxy garage floor Mar Vista cost: how much for a two-car garage?
A two-car flake garage in Mar Vista, up to 400 sq ft, costs $2,600-$4,000 at $6.50-$10 per sq ft. Solid color is $3,800-$4,600, metallic $5,000-$7,400 and quartz $3,600-$6,600. Every project starts at $2,600, and slab repair, moisture work and layer count set where you land.
I rent in Mar Vista. Can I get the garage floor coated?
You can, with the owner's written approval. About 62% of occupied homes in ZIP 90066 are rented, so landlord sign-off is routine. We put the scope, system and warranty terms in writing so the owner can say yes with confidence.
Does a floor coating need a City of Los Angeles permit?
The Department of Building and Safety website does not address floor coatings, so we cannot cite a rule. Mar Vista is inside the City of Los Angeles, which makes LADBS the right office to ask. If an association or lender wants a statement, we provide the scope of work.
Are older Mar Vista slabs a problem for epoxy?
Older slabs are workable when they are prepared. Most Mar Vista housing dates from 1940-1979, so we expect old paint, oil and patched cracks. We test moisture, grind to a bonding profile, fill damage and then select the basecoat. Preparation matters more than the age of the concrete.
What does a 1,500 sq ft epoxy floor cost in Mar Vista?
Large floors are priced per sq ft, so the system you pick sets the rate: $6.50-$10 for flake, $9.50-$11.50 for solid color, $12.50-$18.50 for metallic, $9-$16.50 for quartz and $6.50-$9 for grind and seal. An owner with a big workshop or shared parking area gets a total only after we measure the space and test the slab.
Polyaspartic or epoxy: which handles Mar Vista sun better?
Polyaspartic is the UV-stable option, which is why it forms the topcoat on flake floors and the finish on driveways and patios. Epoxy basecoats bond to the slab, and moisture-barrier epoxy protects damp concrete. Most floors combine them, with the slab test deciding the basecoat.
Is a Mar Vista garage floor upgrade worth it, or is crack repair enough?
Repair alone patches damage, while a coating seals the whole slab, so an upgrade pays off when you want a floor that wipes clean and hides stains. Cracks and joints are filled as part of every prep. If the concrete is sound and you only want it sealed, grind and seal at $6.50-$9 per sq ft is the lighter step.
What does your limited lifetime adhesion warranty include?
It addresses whether the coating stays bonded to the prepared slab. Written terms arrive with the estimate, so nothing is a surprise at signing. Damage from impact, chemicals or concrete movement is not covered, and we explain what each of those means for your floor.
Can mold grow under an epoxy garage floor in Mar Vista?
Mold needs moisture, and a coating laid over a wet slab can hold that moisture in. For that reason every Mar Vista estimate starts with a moisture test, and a moisture-barrier epoxy basecoat goes down whenever the readings call for one. A bonded coating on a dry, tested slab leaves nowhere for water to collect.
Do you install residential epoxy flooring inside Mar Vista homes?
Yes, interior slabs take solid color epoxy at $9.50-$11.50 per sq ft over 3 days, metallic at $12.50-$18.50 over 3-4 days, or grind and seal at $6.50-$9. Utility rooms and small workshops with bare concrete are common jobs. Renters need the owner's written approval, and we put the scope in writing for them.
Other Westside areas on our route
Looking for epoxy flooring near me? These areas are close, with straight-line distances from central Mar Vista: Marina del Rey and Playa Vista 2.0 miles each, Culver City 2.3, Venice 2.5, Santa Monica 3.6 and Playa del Rey 3.8.
Reading list for Mar Vista floor projects
Budgeting? The epoxy flooring cost guide and our post on how much a cure takes before parking help you plan. Thinking of tackling it yourself? Read DIY kit versus professional, then see how to keep it clean once it is down. Browse the gallery or the full service area list.
